Closing in the Gables – Part 1: Framing and sheathing

With the windows and doors almost all installed, we decided to change gears and close in the gables. This part of the house is not structural, so I have more leeway with how to do it. I still used 16″ centers for my framing, though. I decided to frame it in with 2×6’s, since I had almost all the lumber I needed for free from when I was working on the roof and a guy just wanted to get rid of them. The biggest challenge was getting it all up there. My 24′ ladder only reaches the top of the … Continue reading Closing in the Gables – Part 1: Framing and sheathing

Floor Joists – Part III: subfloor

In the last post, I finished the joist installation. Before installing the 4×8 3/4″ OSB panels for the subfloor, I wanted to get everything as near as possible to level. The set up The 2×12 double beams are made out of 20 foot long boards. They are not perfectly straight over that distance. When I installed them, I checked carefully for any crown in the boards, and placed it up. But you don’t want your joists following the crown of the beam. I used a water level to level the joists, and followed that line when installing them. The idea … Continue reading Floor Joists – Part III: subfloor