Staining Logs

It’s been a lot of work getting to this point where we can stain the logs. About 9 months. Why has it taken so long? So many reasons, that I guess I should start at the end of the last major milestone- the roof. Summary: June 2019 – March 2020 I got the roof on June 2019. I had promised myself and my wife that I would finally get that truck working and install the new motor. So I took a month off from the cabin and worked on the truck- replacing parts as I went. I got it running … Continue reading Staining Logs

Pressure washing

I’d love to say I’m installing the 1st floor, which will mean installing ledger boards around the inside perimeter of the house. But I’m not. They rest on the piers, and are lag screwed to the 1st layer of logs. Two 2×12’s are bolted together and run the length of the inner piers. Floor joists are hung from the ledger boards, and butt into the two 2×12’s – like this: I need about 90 joists. I’d like to use the “I-Joist” engineered beams because they are stronger than 2×12’s, and they don’t bow. I called around- looks like Discount Builders … Continue reading Pressure washing