Floor joists – Part II: beams and joists

The setup With the rim joists installed, it was time to install the two double beams. They are 20 foot 2×12’s sandwiched together with 1/2″ bolts and nuts, there are 4 boards in each of them, and they span 40 feet across the house, supported by 5 piers each. There are two of these beams. I decided to install one, then attach all the floor joists to it, then install the second one later. Space is at a premium inside my cabin with all the lumber and osb stacked inside.   When I set the forms for the inner piers … Continue reading Floor joists – Part II: beams and joists

Finishing Foundation, Getting ready to install Lifting poles

We didn’t have any blowouts on the foundation. I waited seven days for the concrete to dry, and then I started pulling the plywood off the piers. They looked ugly: The neighbor even came over to have a look. He said, “you gotta cover those up with mortar- if water gets in there and freezes, it’ll crack your foundation. “But they’ll be under the house- and there’ll be a ten-foot wide porch to protect them,” I protested. “Doesn’t matter- humidity in the air can do it, too. The building inspector might not like ’em looking like that,” he reminded me. … Continue reading Finishing Foundation, Getting ready to install Lifting poles

Even More Committed

We could have backed out after cutting all the logs- could’ve called a logger and said, “come get ’em”. Or the water and power. But it’s getting harder each time we add something. Today, we poured concrete. Looks like we’re committed now. But I should back up a little… Where we left off In my last post, I thought it would go smoothly (why did I think that?) when I called the building inspector (BI)- after all, the city had already approved my plans, which were designed by a licensed engineer; I was following city code (minimum 12″ below frost … Continue reading Even More Committed