Floor Joists – Part III: subfloor

In the last post, I finished the joist installation. Before installing the 4×8 3/4″ OSB panels for the subfloor, I wanted to get everything as near as possible to level. The set up The 2×12 double beams are made out of 20 foot long boards. They are not perfectly straight over that distance. When I installed them, I checked carefully for any crown in the boards, and placed it up. But you don’t want your joists following the crown of the beam. I used a water level to level the joists, and followed that line when installing them. The idea … Continue reading Floor Joists – Part III: subfloor

Floor joists – Part I: Rim Joists

Note: This happened before the chinking post, but I got too excited about chinking! So here you go…. The setup Staining is done. Gutters are done. Logs are dry. But the ground inside was staying moist – like, all the time. I thought after I got the roof on things would eventually dry out inside the cabin. Weirdly, they didn’t. Our water table is somewhat high, but not overly high- I dug down 4 feet and didn’t find any water. It must just be “the humid South”. I researched and found that installing a vapor barrier – basically 6 mil … Continue reading Floor joists – Part I: Rim Joists

Staining Logs

It’s been a lot of work getting to this point where we can stain the logs. About 9 months. Why has it taken so long? So many reasons, that I guess I should start at the end of the last major milestone- the roof. Summary: June 2019 – March 2020 I got the roof on June 2019. I had promised myself and my wife that I would finally get that truck working and install the new motor. So I took a month off from the cabin and worked on the truck- replacing parts as I went. I got it running … Continue reading Staining Logs