1st layer done

This is a great feeling- The lifting poles worked, the pulleys and chain hoists worked, we figured out the kinks and got all four logs on the piers. It looks less like a grave yard with tombstones sticking up, and more like a….well, at least a perimeter with big posts sticking out of it: There was a little preparation required before setting the logs down on the piers: That’s pressure treated #2 pine – 2×12 from the local hardware store, laying on top of a shingle (90lb builder’s felt) that I sourced from the county dump (they were new in … Continue reading 1st layer done

“Houston, we have lift-off”

The poles are in! I need to thank everyone who helped out. I often feel like I’m a recluse, and I have a hard time in social settings. I’m pretty much an introvert – parties wear me out, while enjoying gardening or working on my own is energizing. I asked around at church last week, and made a couple of pleas asking for help on facebook. I got a commitment of two people by Thursday night, but we needed more- a lot more. I got a couple more Friday night, and a couple of calls Saturday morning. It was humbling … Continue reading “Houston, we have lift-off”

Finishing Foundation, Getting ready to install Lifting poles

We didn’t have any blowouts on the foundation. I waited seven days for the concrete to dry, and then I started pulling the plywood off the piers. They looked ugly: The neighbor even came over to have a look. He said, “you gotta cover those up with mortar- if water gets in there and freezes, it’ll crack your foundation. “But they’ll be under the house- and there’ll be a ten-foot wide porch to protect them,” I protested. “Doesn’t matter- humidity in the air can do it, too. The building inspector might not like ’em looking like that,” he reminded me. … Continue reading Finishing Foundation, Getting ready to install Lifting poles