Roof – Part 3: Installing almost everything on the roof

box frame for insulation almost complete The shingle elevator was made out of wood, and it broke after the week of rain weakened it. So I welded a new one. It works better, but I’m worried about the rails it rides, which are 22 foot long 2×10’s. I’ve made a lot of progress on the roof- the frame is complete, the insulation is completely installed on both sides. I had to stop and measure how much insulation I had left- and use the hot wire foam cutter to cut the 9″ thick pieces down to size – they were too … Continue reading Roof – Part 3: Installing almost everything on the roof